Dirt Moving Service

Cost of Dirt Moving in Summerfield

Zip

The cost of dirt moving in Summerfield, FL can vary significantly based on a variety of factors. Whether you're preparing a site for construction, landscaping, or other projects, understanding the elements that influence pricing can help you budget effectively.

Factors Affecting Cost

  • Type of Dirt: Different types of dirt such as topsoil, clay, or sand can have varying costs.
  • Quantity of Dirt: The amount of dirt to be moved directly impacts the overall cost.
  • Distance of Transport: The distance dirt needs to be transported affects fuel and labor costs.
  • Accessibility of Site: Easy access can lower costs, while difficult terrain or tight spaces can increase them.
  • Equipment Required: Specialized equipment may be needed for certain tasks, adding to the cost.
  • Labor Costs: The number of workers and the duration of the project can influence pricing.
  • Permits and Regulations: Local permits and compliance with regulations may incur additional fees.

Average Costs for Common Tasks

Task Average Cost (Summerfield, FL)
Topsoil Delivery (per cubic yard) $20 - $40
Excavation (per hour) $100 - $150
Grading (per square foot) $0.50 - $1.50
Site Preparation (per square foot) $1 - $3
Dirt Removal (per cubic yard) $30 - $50

Understanding these factors and average costs can help you plan and budget for your dirt moving needs in Summerfield, FL effectively.

Dirt Moving Quotes

Enter your Zip Code

Dirt Moving

Copyright © 2025 . All Rights Reserved

SummerfieldGrading.com is a service to assist homeowners in connecting with local service contractors. All contractors are independent, and this site does not warrant or guarantee any work performed. It is the responsibility of the homeowner to verify that the hired contractor furnishes the necessary license and insurance required for the work being performed. All persons depicted in a photo or video are actors or models and not contractors listed on this site.